REGJISTRI I PROCEDURAVE ADMINISTRATIVE
NË KOMUNËN E GJAKOVËS

AL  SR  EN

Construction Permit regarding construction of infrastructure (water supply, sewage, electric grid/high voltage, street network)

Directorate for Urbanism and Protection of Environment

Qëllimi: Obtaining permit for construction of infrastructure.

Përshkrimi: The applicant may apply at the Admission Office and attaches the required documents. In case consent from appropriate authorities is required, an official deadline will be set for receiving and presenting them. The project will be checked, approved, have taxes paid and the construction permit is issued.

Baza ligjore

Vlefshmëria e procedurës administrative: Permanent (if construction begins) 1 year (if construction DOES NOT begin)

Informatat e kërkuara

  • Name of Company
  • General information of the company
  • Information on the location for which a construction permit is being requested
  • Brief description of the purpose of the request
  • Details of the contact person

Koha e parashikuar brenda së cilës duhet të jepet përgjigje për proceduren (në ditë): 45

Dokumentacioni i kërkuar

  • Copy of plan (Original)
  • Ownership Certificate (Original)
  • The legal documentation of the projecting company, which drafts the main project for construction permit. (Original)
  • Property Tax Confirmation (Original)
  • Agreements for unhindered connection to utilities (Radoniq Hidrosystem, PTK, District Heating, Waste management company, KEDS) (Original)
Pa pagesë

Formulari nuk është në dispozicion